How to Compare Contractor Quotes for Property Repairs

Compare repair quotes on scope, costs, dates and exclusions before approving work. Includes a practical quote-comparison checklist for landlords.

By TennanSeed ·

Start with the same brief

Two totals are only comparable when they describe substantially the same job. Give each contractor the reported symptoms, the location, the intended result and any constraints you know about. Separate facts from assumptions: “water appears beneath the sink after use” is different from declaring which part has failed.

Ask whether the price covers investigation, a temporary measure or the permanent repair. If the cause needs diagnosis, agree how that stage is priced and how any further work will be authorised. Do not imply certainty that the available information cannot support.

A quote-comparison checklist

Compare these points before the headline total
CheckQuestion to resolve
Scope and resultWhat exactly will be repaired, replaced, tested and made good?
MaterialsWhich parts, quantities or specifications are included? Are alternatives subject to approval?
Labour and visitsHow many visits are assumed? Does the estimate include investigation and return attendance?
Tax and totalIs tax included, and is the total in the same currency? Do not assume every contractor has the same tax position.
ExclusionsAre disposal, parking, access equipment, making good or further faults excluded?
DatesWhat is the proposed start, expected duration and quote-validity period?
Payment and changesWhat are the payment stages and how must variations be approved?
SuitabilityWhat credentials, insurance or specialist competence are appropriate for this particular work?

A lower price can describe less work

Imagine two fictional quotes. Quote A is £220 for investigation and tightening a connection, with parts and a return visit extra. Quote B is £340 for replacement of the specified fitting, parts, testing and making good. These are not two prices for identical work. First ask which scope addresses the problem, then compare suitable offers.

Keep assumptions and exclusions beside each quote rather than burying them in an email thread. If the contractor revises the price or brief, retain the earlier version and identify which version you approve. Do not leave two different “approved” totals in circulation.

Questions to send before approval

Thank you for your quote for [repair reference]. Before I decide, please confirm:
1. The work, materials and testing included.
2. The complete price, currency and tax treatment.
3. Exclusions or assumptions that could change the price.
4. Proposed start, duration and how long the quote remains valid.
5. Payment stages and the process for approving extra work.
6. Any relevant credentials, insurance and completion documents.
Please identify the current version of the quote in your reply.

Record an explicit decision

Once you choose, record the approved quote version, scope, amount and decision-maker. Confirm appointment and access arrangements separately where needed. If the scope changes, agree the variation before treating the earlier approval as permission for additional work.

In TennanSeed Enterprise, the contractor submits an itemised quote against the job brief and a separate property-team manager approves it. The current contractor’s latest eligible quote is used; earlier versions remain available for reference. Approval records a decision in the software. It does not transfer money, replace a building contract or independently verify the contractor.

Do you always need three quotes?

There is no universal quote count for every repair. Follow any rules applicable to your ownership, management agreement or procurement process. A genuinely urgent situation may first need competent assessment and immediate action. Do not let a routine comparison exercise delay necessary safety measures.

What should happen after approval?

Keep the approved scope visible to the people carrying out and checking the work. Record delays, changed arrangements and agreed variations. When the work is finished, compare the actual result against the scope and retain appropriate evidence before confirming completion. The next guide provides a checklist for that handover.

Keep the next step visible.